Bladder DIke MPE 20

Request Quote

MPE Spill Containment System for 20,000 Gallon Bladder

Description

MPE Spill Containment System for 20,000 Gallon Bladder

Simple to install and cost effective spill containment system for 20k Fuel Bladders, Water Bladders, etc. The 20k MPE system can be mounted on top of a wide array of surfaces and requires no alterations to the substrate surface. MPE Wall Struts and MPE Corner Wall Struts are affixed to each other using our MPE Locking Post. Each Wall Strut has two large molded knuckles that interlock with two large molded knuckles from another wall strut. The Locking Post is then dropped through the four interlocked large molded knuckles to connect the walls.The lightweight modular design of each strut makes it a breeze for two people to install the entire system without the use of any special lifting tools. The Wall Struts and Wall Corner Struts allow users to build systems out to any length and width based off of dimensional requirements of the primary containment vessel and spill capacity requirements.

Installation: One to Two Installers lift the MPE Wall Struts and the MPE Corner Wall Struts to their desired location. Locking Posts are used to affix the walls together. Next the steel spider cable harness for the system is stretched to all four ends of the system and D-ring connectors on the end of the harness are attachrd to custom slots molded into the base of the MPE Wall Struts. Once the steel spider cable harness is securely attached and pulled taut, a custom liner is rolled out on top of the harness and draped over the end-walls. Finally, Liner Locks are used to clamp the liner securely to the top of the MPE Wall Strut

The MPE Spill Containment System is a completely surface-mounted spill containment system and is not secured to a substrate. Instead the weight of the primary containment vessel and the liquid contained within it on top of the liner and cable harness make-up the primary anchor for the system. The MPE Walls heavy polyethylene construction along with the Locking Post connecting the walls ensures the perimeter walls are stationary, while the MPE Liner Locks ensure the Liner is locked securely in place and cannot be affected by the wind, foot traffic, spills, or any other forces. In case a catastrophic spill should occur, the Steel Harness locks the base of the MPE Walls into place and the inward angle of the MPE Wall Strut ensures any liquid flows back into the middle of the system and not over the wall.

For 20,000 gallon Fuel Bladder Containment, we recommend either using our 3’ MPE Wall or our 4’ MPE Wall. Due to the massive volume and the catastrophic potential of Bladder spills we do not recommend using our 2’ MPE Wall or our 1’ MPE Wall.

Reviews

There are no reviews yet.

Be the first to review “Bladder DIke MPE 20”

Your email address will not be published. Required fields are marked *